Just-in-time changeover cost minimization problem : Dynamic programming approach and complexity results
Overview & Synopsis
The problem studied in this paper originates from a just-in-time environment where a new supplying mode, called Synchronous Delivery, has been introduced recently. We consider a multi-product single machine scheduling problem in which the total changeover costs has to be minimized. The products are of different types and a changeover cost is incurred whenever switching from one product type to another. For each product, the processing time is equal to one and its deadline is different from deadlines of all other products. We present five complexity results and propose dynamic programming and heuristic approaches to the problem. Computational results are given comparing two heuristics to the optimal solution given by the dynamic programming method.
hal.science)
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Just-in-time changeover cost minimization problem : Dynamic programming approach and complexity results |
|---|---|
| Author / Organization | Lyès Benyoucef, Bernard Penz |
| Subject & Discipline | Multidisciplinary Academic Open Research |
| Categories | Science & Mathematics |
| Publication Year | 2003 |
| License / Rights | Open Access / Creative Commons |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
HAL Open Science
(hal.science)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-94979 |
| Original Source Link | Visit Source Page on hal.science » |