Minimizing makespan in flowshop with time lags
Overview & Synopsis
We consider the problem of minimizing the makespan in a flowshop involving maximal and minimal time lags. Time lag constraints generalize the classical precedence constraints between operations. We assume that such constraints are only defined between operations of the same job. We propose a solution method and present several extensions.
Indexed from repository: HAL Open Science
(
hal.science)
Keyboard Shortcuts:
← / → for pages • + / - for zoom • 0 to fit width
Powered by Mozilla PDF.js v3.11
Document Information
| Document Title | Minimizing makespan in flowshop with time lags |
|---|---|
| Author / Organization | Julien Fondrevelle, Ammar Oulamara, Marie-Claude Portmann |
| Subject & Discipline | Multidisciplinary Academic Open Research |
| Categories | Science & Mathematics |
| Publication Year | 2005 |
| License / Rights | Open Access / Creative Commons |
| Resource Verification | Listed PDF (Verification Pending) |
| Original Host Website |
HAL Open Science
(hal.science)
|
| File Format | application/pdf (Portable Document Format) |
| Language | EN |
| Catalog ID | DOC-219720 |
| Original Source Link | Visit Source Page on hal.science » |