India - Green National Highways Corridor Project
World Bank

India - Green National Highways Corridor Project

Author / Organization:
Economics & Development Published 2026 Verification Pending

Overview & Synopsis

Ratings of the Green National Highways Corridor Project for India were as follows: outcome was moderately unsatisfactory; Bank performance was moderately satisfactory; monitoring and evaluation quality was modest. Lessons learned highlight that innovation must be matched with design readiness, delivery capacity, and institutional demand; future operations should first pilot green, climate resilience, and safety innovations on a smaller, well-prepared set of activities, with core standards, design approaches, verification protocols, and responsibilities agreed upfront, before scaling. Performance-based conditions linked to civil works require clear and practical verification arrangements; during appraisal, requirements for achievement and verification should be jointly defined, objectively measurable, stress-tested through likely implementation scenarios, and accompanied by clear explanation of environmental and social safeguards, especially for agencies new to Bank projects. For technically complex works, design readiness and prudent use of the engineering, procurement, and construction model are critical; the EPC model should not substitute for robust designs, and its suitability should be assessed against the capacity of the employer, contractors, and supervision engineers, with mechanisms for proactive design validation, timely field review, appropriate engineering modifications, and, where warranted, independent technical review. Procurement choices strongly influence quality and environmental and social compliance; future projects should right-size contract packages to attract capable firms, scrutinize abnormally low bids, rigorously assess contractor financial capacity and mobilization plans, and apply rated criteria to reduce the risk of selecting underqualified contractors. Early reporting and management of grievances can prevent escalation; implementing agencies should promptly inform the task team of any court cases or complaints, including those outside the grievance redress mechanism, and provide regular updates so corrective measures can be identified and implemented in time. Finally, performance-based conditions should align with the implementing agency’s mandate; indicators and disbursement-linked results must be within the agency’s control, and where outcomes depend on other entities, formal inter-agency commitments should be secured upfront or disbursements should not be tied to outputs beyond the agency’s authority.

Advertisement
SPONSOR CONTENT
Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title India - Green National Highways Corridor Project
Author / Organization World Bank
Subject & Discipline FY17 - Rural and Inter-Urban Roads,FY17 - Public Administration - Transportation
Categories Economics & Development
Publication Year 2026
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-16135
Original Source Link Visit Source Page on documents.worldbank.org »