Economics & Development
Reference documents in Economics & Development.
Documents in Economics & Development
Page 3531 of 4442-
This report presents a comprehensive assessment of Honduras’ transport sector under the Infrastructure Sector Assessment Program (InfraSAP 2.0). It examines the role of transport connectivity in supporting economic growth, poverty reduction, trade competitiveness, and access to essential services while identifying critical infrastructure, governance, and financing challenges. The assessment highlights key issues including inadequate secondary road networks, climate vulnerability, weak institutional coordination, inefficient logistics systems, limited transport accessibility in rural areas, and constraints in public and private investment. The report also reviews opportunities for mobilizing private finance through Public-Private Partnerships (PPPs) and strengthening sector governance. It concludes with a strategic roadmap of policy recommendations focused on improving transport connectivity, enhancing infrastructure resilience, increasing operational efficiency, modernizing transport services, and strengthening governance and financing mechanisms to support sustainable economic development in Honduras.
-
Santa Catarina Flood Infrastructure and Resilience Improvement Project for Brazil has the development objectives of building resilience to climate related disasters in targeted areas of Santa Catarina and strengthening institutional capacity for disaster risk management in the state. Component 1: Building resilience to floods and other disaster risks in selected basins of Santa Catarina will reduce climate-related disaster risks through integrated grey, green, and hybrid measures, including execution of flood mitigation works in the Itajaí Valley, updates to hydrological and hydraulic modeling, and development of tools to assess the benefits and co-benefits of nature-based and hybrid solutions such as retention basins and linear parks; works include up to four upstream flow control dams and flow control works in an existing diversion canal in the city of Itajaí, complemented by design studies and environmental and social instruments, and the creation of a comprehensive flood risk and decision management platform to guide basin-scale investments. Sub-components: Sub-component 1.1 will mitigate flood risk in the Itajaí Valley through construction and rehabilitation of hydraulic and flow control infrastructure, development of designs and studies, the design and implementation of green and hybrid infrastructure for flood mitigation and biodiversity conservation, support for land use changes and improved productive practices, and deployment of a multi-criteria flood risk and decision management platform; Sub-component 1.2 will establish an enabling environment for disaster risk management in all basins through technical studies, risk assessments, data analysis and visualization to generate disaster resilience plans for prioritized regions, and a state-level study of climate scenarios to identify vulnerabilities and recommend adaptation priorities across sectors. Component 2: Investing in early-warning systems and local capacities for resilience will strengthen municipal planning and preparedness and modernize state climate monitoring and forecasting through a combination of analytics, tools, and equipment. Sub-components: Sub-component 2.1 will promote analytics, planning, and project preparation for hybrid disaster risk management solutions at the municipal level by creating a geospatial tool to pre-select and appraise local adaptation actions such as sustainable urban drainage and digital alert systems, providing coaching and project structuring support including exploration of public-private partnership opportunities, and financing training, risk mapping, environmental and hydrological studies, macro-drainage assessments, and municipal risk reduction plans; Sub-component 2.2 will strengthen climate monitoring, early warning, and local preparedness by procuring a coastal meteorological radar, expanding the hydrological and meteorological station network with high-availability automatic stations, developing an integrated system for hydrometeorological analysis and short-term forecasting hosted at the state emergency center, creating an open-data platform for climate risk information and early action guidance, and delivering capacity building that trains women as early warning agents and implements gender-sensitive awareness and alert campaigns. Component 3: Project Management and Institutional Capacity will support overall coordination, fiduciary and technical management, environmental and social risk management, and monitoring and evaluation through technical assistance, consulting and non-consulting services, operating costs, and goods, including the hiring of a firm to provide technical and operational support and targeted capacity building on key standards such as dam safety.
-
This validation of the World Bank Group’s (WBG) Completion and Learning Review (CLR) covers Tajikistan’s Country Partnership Framework (CPF) for the fiscal years (FY) 2019-23, which was extended by one year to FY24 with the FY24 Performance and Learning Review (PLR) of January 2024. The CPF was aligned with Tajikistan’s National Development Strategy to 2030 (NDS 2030) and addressed key constraints identified in the 2018 Systematic Country Diagnostic (SCD). The CPF program was structured around three focus areas aligned with the WBG twin goals of reducing poverty and boosting shared prosperity on a livable planet, and addressed corporate priorities on gender, climate change, human capital, and jobs and economic transformation (JET). Focus Areas 1 and 3 emphasized reducing poverty, and all focus areas supported shared prosperity. Focus Area 1 supported human capital, gender, and climate change. Focus Area 3 supported JET and climate change. The program design adapted operationally to shocks such as the COVID‑19 pandemic and political and institutional constraints. The PLR was late and highlighted weaknesses in the original results framework, and while the program showed operational flexibility in responding to shocks, strategic learning was only partially translated into timely programmatic corrections. Implementation faced early delays, including capacity and fiduciary readiness constraints. The WBG responded through strengthened fiduciary and safeguard oversight, and targeted capacity building. All closed projects were rated moderately satisfactory or better, and high‑quality analytical work informing reforms and lending. There was effective risk management and evidence of WBG collaboration, despite limited scope for private investment engagement due to sustained prevalence of SOEs, shallow financial markets, and limited competition. The WBG program helped to sustain social programs from regressing during the COVID-19 pandemic and supported core institutions through periods of fiscal stress, while contributing to energy-sector governance reforms. Key areas falling short of expectations were the unresolved financial viability of utility companies and limited progress in private‑sector transformation.