Georgia - East-West Highway Corridor Improvement Project
World Bank

Georgia - East-West Highway Corridor Improvement Project

Author / Organization:
Economics & Development Published 2026 Verification Pending

Overview & Synopsis

Ratings of the East-West Highway Corridor Improvement Project for Georgia were as follows: outcome was moderately satisfactory, Bank performance was moderately satisfactory, and monitoring and evaluation quality was modest. Lessons learned indicate that for technically complex infrastructure, dynamic and adaptive implementation support is as important as thorough preparation; recommendations are to resource project management adequately, ensure early identification and escalation of issues, and include contractual provisions that require robust implementation planning and enable timely remedies for weak consultant and contractor performance. Programmatic, long-term sector engagement proved more effective than standalone operations in achieving institutional and policy outcomes; future projects should align with national strategies, build on prior analytical and capacity work, and be sequenced to pave the way for subsequent investments to sustain reforms across agencies such as the Roads Department (RD) and the Ministry of Economy and Sustainable Development (MESD). Large, complex works require explicit recognition of residual uncertainty and built-in flexibility; contracts and schedules should incorporate realistic timelines, contingencies, and allowances for geotechnical and climate risks, with early access to specialized expertise in areas such as tunneling and slope stabilization. Good quality at entry remains critical; future operations should strengthen detailed design, climate and geotechnical risk screening, and supervision arrangements, while maintaining continuous, inclusive stakeholder engagement to reduce downstream risks and enhance acceptance. Supervision effectiveness depends on capable engineers and transparent accountability; therefore, selection of supervision consultants should be based on proven track records, with clear performance benchmarks and mechanisms for open communication so advice is acted upon before problems escalate, thereby safeguarding implementation efficiency and timely delivery.

Advertisement
SPONSOR CONTENT
Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title Georgia - East-West Highway Corridor Improvement Project
Author / Organization World Bank
Subject & Discipline FY17 - Rural and Inter-Urban Roads,FY17 - Public Administration - Transportation
Categories Economics & Development
Publication Year 2026
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-85578
Original Source Link Visit Source Page on documents.worldbank.org »