Kosovo - Improvement and Rehabilitation of Irrigation Systems Project - Implementation Completion and Results Report (ICR) Document
World Bank

Kosovo - Improvement and Rehabilitation of Irrigation Systems Project - Implementation Completion and Results Report (ICR) Document

Author / Organization:
Economics & Development Published 2026 Verification Pending

Overview & Synopsis

Ratings of the Improvement and Rehabilitation of Irrigation Systems Project for Kosovo were as follows: outcome was moderately satisfactory; Bank performance was satisfactory; M&E quality was substantial. The project showed that institutional and human capacity, not engineering works, pose the principal sustainability risk in irrigation, thus future operations should give equal emphasis to institutional strengthening, operational preparedness, asset management, and financial sustainability alongside civil works, including formalized arrangements for Supervisory Control and Data Acquisition operation, staffing, and software licensing, as well as cost recovery and business planning. Delays in establishing the Project Implementation Unit can critically compress implementation and limit results visibility; therefore, implementation readiness should be secured before effectiveness by front-loading recruitment, permits, and procurement packaging, and by using centralized implementation support mechanisms such as a central Project Implementation Unit within the Ministry of Finance to mitigate capacity constraints and accelerate startup. Rehabilitation of aging irrigation systems requires explicit recognition of legacy infrastructure uncertainty; preparation should include enhanced field verification, systematic validation of as-built documentation, and explicit contingencies for underground discrepancies in designs, contracts, and budgets to avoid disruptions during works. Capacity development must be embedded and sustained throughout project planning and implementation, closely linked to physical investments, with clear objectives, dedicated resources, and follow-through to ensure operational uptake by utilities, ministries, municipalities, and farmers; this includes earlier attention to digital systems procurement, licensing, staffing, and training to ensure continuity and effective use post-completion. Finally, successor operations should sequence results frameworks to reflect the slower maturation of behavioral and productivity outcomes relative to infrastructure delivery, and plan post-closing monitoring over several seasons to track crop shifts, irrigation uptake, and water-use efficiency, while maintaining coordinated stakeholder engagement and visibility throughout.

Advertisement
SPONSOR CONTENT
Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title Kosovo - Improvement and Rehabilitation of Irrigation Systems Project - Implementation Completion and Results Report (ICR) Document
Author / Organization World Bank
Subject & Discipline FY17 - Public Administration - Agriculture, Fishing & Forestry,FY17 - Irrigation and Drainage
Categories Economics & Development
Publication Year 2026
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-5405
Original Source Link Visit Source Page on documents.worldbank.org »