📖
Dominica - Geothermal Risk Mitigation Project
World Bank

Dominica - Geothermal Risk Mitigation Project

Author / Organization:
Economics & Development Published 2026 Verification Pending

Overview & Synopsis

Ratings of the Dominica Geothermal Risk Mitigation Project for Dominica were as follows: outcome was moderately satisfactory, Bank performance was moderately satisfactory, and M&E quality was modest. Front-end readiness and context-sensitive design are essential in geothermal operations; future projects should complete key technical studies, site investigations, land access arrangements, and feasibility assessments before major procurement, while adopting realistic cost estimates, adequate contingencies, and schedules that reflect small island conditions such as marine logistics, limited local capacity, labor constraints, and exposure to extreme weather. Public financing is best deployed to reduce upstream resource risks and create conditions for private investment, using a phased approach that confirms the resource and enables private participation in downstream generation once risks are lowered. Early and systematic market engagement is critical; practical steps include robust market sounding, realistic packaging, and development of fit-for-purpose procurement instruments tailored to geothermal drilling to reduce clarification cycles and failed tenders. Flexible implementation arrangements, adaptive risk management, and robust financial planning should be embedded, with contingency financing, options to restructure, frequent budget reviews, timely contract amendments, improved cash flow forecasting, and early communication between implementing agencies and financiers to mitigate fiduciary risk and avoid delays. Specialized contract management and technical oversight must be sustained throughout the project, ensuring dedicated expertise in contract administration, quantity surveying, cost control, and management of complex variations, alongside continuity of experienced technical, procurement, and financial management support from preparation through completion. M&E should function as an active management tool that tracks upstream risk reduction and informs timely decisions, with indicators aligned to the risk mitigation pathway and regular supervision and technical reviews to support adaptive management. Environmental and social management and stakeholder engagement should be integrated early, scaled to the project risk profile, and sustained through implementation; this includes involving environmental and social specialists from the outset, preparing practical safeguard instruments, maintaining continuous community engagement, and integrating biodiversity management and grievance redress to strengthen performance, build public trust, and deliver durable local capacity, employment, and training benefits.

Advertisement
SPONSOR CONTENT
Indexed from repository: World Bank Documents & Reports (documents.worldbank.org)
Loading document from verified source...
Keyboard Shortcuts: ← / → for pages • + / - for zoom • 0 to fit width Powered by Mozilla PDF.js v3.11

Document Information

Document Title Dominica - Geothermal Risk Mitigation Project
Author / Organization World Bank
Subject & Discipline FY17 - Renewable Energy Geothermal
Categories Economics & Development
Publication Year 2026
License / Rights Creative Commons Attribution 4.0 (CC BY 4.0)
Resource Verification Listed PDF (Verification Pending)
Original Host Website World Bank Documents & Reports (documents.worldbank.org)
File Format application/pdf (Portable Document Format)
Language EN
Catalog ID DOC-25865
Original Source Link Visit Source Page on documents.worldbank.org »